Quote: The combat group then took up an all-round position where the road cross the rail road and patrols were detached to reconnoiter the surroundings. 战斗群随后占领了一个位于铁路与公路交叉口的环形阵地,并分配了巡逻兵侦察周围环境。
Study on the Measuring& Analysis of Plate Leveling for Heavy Gauge Cut to Length Line and Its Processing Simulation; Effect of Horizontal Roll Straightening on Cross Section Dimensions of Heavy Rail 厚板横切机组辊式冷矫直机测试分析与矫直过程模拟研究辊式水平矫直对重轨断面尺寸的影响分析
Research of Process and Equipment for Three Roller Plate Coiling of Level Adjust Below; Effect of Horizontal Roll Straightening on Cross Section Dimensions of Heavy Rail 水平下调式三辊卷板工艺及设备研究辊式水平矫直对重轨断面尺寸的影响分析
Effect of Horizontal Roll Straightening on Cross Section Dimensions of Heavy Rail 辊式水平矫直对重轨断面尺寸的影响分析
The principle and structure of the self made testing instrument for measuring the effective temperature in the full cross section of steel rail are described and discussed in this paper. 论述了自行研制的钢轨全断面有效温度测试仪的原理及结构。
Virgin Trains lost its Cross Country UK rail franchise earlier this month. 本月早些时候,VirginTrains失去了英国CrossCountry铁路特许经营权。
Productive practices confirmed that the process of knitting cross rail had related with the technology configuration of each working procedure, the state machinery, semi-manufactured product quality, the weight of yarn every 100 meters ( CV%), operation and other factors. 生产实践表明,针织横档与各工序的工艺配置、机械设备状态、半制品质量、纱线百米重量CV%值、操作等因素有关。
Productive practice of reducing wool blended spinning knitting cross rail 减少毛混纺针织产品横档的纺纱生产实践
Measurement of effective temperature in full cross-section of steel rail and the data analysis 钢轨全断面有效温度的测量及数据分析
The variation of stress and strain at different part of cross section when straightening, and the rail flatness and distribution of longitudinal residual stress after straightening were investigated. 分析矫直过程重轨断面不同部位的应力、应变变化,矫后重轨平直度以及纵向残余应力的分布。
During the formation of the network of network transit, it is inevitable that some new built tunnels cross the existing urban rail transit lines. 在城市轨道交通网络逐渐形成并完善的过程中,新建隧道近距离穿越既有城市轨道交通地下线路工程越来越多。
Communication with PLC of the ultrasonic inspection center of rail, including network connection, network acceptance, data analysis, database operations and so on is developed. Data of cross dimensional accuracy of rail section is collected. 与重轨检测中心PLC通讯,包括网络连接、网络接受、数据解析、数据分析、数据库操作等功能进行开发,采集到重轨断面尺寸精度数据。
Thirdly, the point factor needs to dredge: Increasing entrances on the third floor and improving the cross rail platform vertical node. 点状要素需要加以疏通:增加火车站的三层入口和跨轨平台的垂直节点改造。